From work truck to show truck.  Sara's first large project vehicle.  She has her 17" rims on and is preparing to airbag it.  Future plans call for a serious bodydrop to the door. Pulling out the stock springs and removing the bed is where we start. Cary plasma cutting out frame for notches. Ready to install second notch and weld it in. Notches done.
Air tanks assembled together and ready for installation. Travis with the love machine, making parts fit.  Notice the large 1/3 horsepower compressor mounted to the frame. Travis fitting the 5/8 air valves to the frame. Mounting the front airbags. Another late night at IF. Sara checking out her lowered ride.

       
Airbagged and laying on the cross members.  This is the first stage for this truck.